The centre is OPEN per usual operations during roadworks, plus swimming lessons continue as normal.

The centre is OPEN per usual operations during roadworks, plus swimming lessons continue as normal.

About Thebarton Aquatic Centre

The South Australian and Australian governments completed a $8.7 million refurbishment in 2024 to deliver an improved Thebarton Aquatic Centre for the community to enjoy. Refurbishments include:

  • upgraded pools – patching and retiling works and repainting of the pools
  • a re-constructed pool concourse including a new wet deck, improve drainage and slip resistance tiles / tactiles
  • new change rooms with more toilets and showers – more than 50% more facilities
  • a new open space at the south of the pool hall
  • more modern pool equipment that is easier to service and maintain
  • a new Lifesaver office and first aid room with direct view and access to the pool deck
  • larger pool equipment storage area
  • building upgrades including new walls, painting and roofing
  • two new multipurpose areas

The NEW Thebarton Aquatic Centre